Photographs No. 6 and 7 show visible mold growth on a finished basement ceiling resulting from a leaking pipe in the kitchen located on the floor above.
Photograph No. 8 illustrates visible mold growth on wood paneling in a finished basement that occured after flooding. Since mold cleanup was delayed, moisture trapped in the carpeting along the trim leading to mushroom-like growth.
In each of these cases, JM Associates, Inc. arranged mold remediation and post remediation mold testing services and follow up mold inspection services to ensure the projects were properly completed.